Welding QC Inspector - Bulgaria - Job No. 3012 Listed 13/2/15
Project Quality Manager - Jakarta, Indonesia - Job No. 3000 Listed 10/02/15
Project Quality Manager – Kazakhstan – Job No. 2993 Listed 14/10/2014 
Project Quality Manager - Milan, Italy – office then Saudi Arabia – site base - Job No. 2983 Listed 22/8/14
Quality Control Manager - Anapa, Russia - Job No. 2975 Listed13/8/14
Baseline Inspection Coordinator - Onshore Nigeria - Job No. 2970 Listed 8/8/14
 

Click here for UK vacancies

Back to Top

Welding QC Inspector - Bulgaria - Job No. 3012 Listed 13/2/15

Project, flag:  S7000, Bahamas
Location: Worldwide, currently Bulgaria
Position: Welding QC Inspector
Contract start:  ASAP
Contract duration:  31.10.2015 (renewable)
Work/leave rotation: 56 working days/ 28 days unpaid leave
Working hours: 84 hours a week (7 days/ 12 hours a day)
 Salary: Offshore: GBP 8400 consolidated monthly (paid only when working)
Insurances: Death and Dismemberment, Income protection, health insurance
Flights: All provided by client
Pleas provide the following documents ASAP:
Updated CV
Diploma
Various professional and training certificate (Welding and Coating
Certificates a must)
Work employment certificates
It is essential to provide all listed documents
Mission
Execute the field welding inspection, surveillance and Quality Control
activities on site, collecting the relevant objective evidences
Ensure that all welding operations are executed in accordance with all
relevant Codes of Practices and Company procedures/practices/Quality Control
Plans/Inspection Test Plans Tasks
Execute the specific inspections on materials, equipment and
construction/installation activities on site
Issue the relevant Quality Records and, when necessary, support the Quality
Control Manager/Supervisor for none conformances reports, verifying
conformity of the work to specified Quality Requirements and ensuring that
the inspections and controls are carried out and documented in accordance
with the Quality Control Plans
Verify welding parameters and consumables during installation/construction
activities
Verify procedures and welders qualifications
Check the availability and suitability of the welding equipment, filler
material, pre-heating, welding, heat treatment, bevels, the extent of the
repairs made by the various welders (taking any corrective action required),
the heat treatment record diagrams
Check and record pipe sequence
Perform pipes line up check, ensuring that all installed pipe/fittings are
compliant to the correct specification and that the material is in
accordance with the specified material traceability requirements
Carry out visual inspections and issues relevant reports
Handle all welding technical queries
Ensure that all welding, heat treatment and any hardness testing are in
compliance with the relevant codes and specifications
Orderly collect and manage/check documents certifying tests, controls and
inspections documents, ensuring that all welding and testing related records
form a complete package and reflect the As Built
Ensure the correct implementation of the approved Quality Control
Plans/Inspection Test Plans relevant to welding by organization in charge of
construction activities
Examine visually work in progress and effectively supervise repair
procedures
Review welding requirements for field erected structures, vessels, tanks,
boilers and other process plants

Back to Top
Project Quality Manager - Jakarta, Indonesia - Job No. 3000 Listed 10/02/15

Start - ASAP
Duration - 15 months
Rotation - 91/16, Single Status
Working days/hours - 8 hours a day 5 days a week
Salary – GBP 450 per day worked
Overtime rate - Overtime payment is included in the basic salary
MEDICAL
Medical Cover - Advanced cover provided by the company
Accidental Death & Dismemberment Cover - 300,000USD
Life Cover - 200,000USD
Income Protection Cover - Basic Cover Provided by the company
FRINGE BENEFITS
Living allowance - Accommodation and board will be provided. If board is not provided then a living allowance will be paid.
Travel - Prepaid Economy class ticket at beginning, end of CNT and for each work leave rotation cycle
Pre employment expenses - On Company account
Pension Fund - 5% paid by the employee and 5% contributed by the employer
Taxes - Taxes in country of work is paid by the company. Taxes in country of domicile is for the employee's responsibility
The expected profile should have over than 15 or 20 years experiences, and 5 years in the proposed role.
12-15 months period of assignment in the project
The nominees shall have LNG experiences and equal complexity.
1. is responsible for project quality and for ensuring that quality issues get resolved
2. Prepares and agrees the Quality Management Plan for FEED work
3. Co-ordinates and develops/assists in the development of necessary project specific procedures
4. Reviews key project deliverables to confirm compliance with project quality requirements
5. Inputs quality requirements to Sub-Contracts and Requisitions
6. Arranges for and assists COMPANY in any audits, develops audit requirements, and maintains a finding closed-out report
7. Manages and undertakes audits of project activities in accordance with the project requirements

Back to Top

Project Quality Manager – Kazakhstan – Job No. 2993 Listed 14/10/2014 

Requirements:
Bachelor’s/university degree
ISO 9001 lead/internal auditor certificate.
More than ten years of relative experience in oil and gas industry
Experience in fabrication of pipe Racks and complex modules
Excellent Experience in Quality Assurance
Main Terms & Conditions for Project Quality Manager
v  Notification
Position Project Quality Manager - (SINGLE STATUS)
Work Location ERSAI Kurik Yard, Kazakhstan
Contract type International Contract with secondment
Start ASAP
Duration 12 months renewable
Rotation 75/21 (75 working days followed by 21 days of unpaid vacation leave)
Working days/hours 260 monthly (10 hours / 6 days a week, from Monday to Saturday)
Salary GBP 550 per day of work and travel
Overtime N/A
Accommodation In line with Company standard
Income protection policy
Medical Insurance Advanced
Travel Prepaid Economy class ticket at beginning, end of CNT and for each work leave rotation cycle
Pre employment Expenses On company account
Role Description
Mission
Plan and implement the Project Quality Management activities within the project
Coordinate the project Quality Control activities implementation
Report to Company Quality Manager information and data about Project in line with Corporate Guidelines
Tasks
Ensure the definition of the Project Quality Management System (PQMS) and preparation and distribution of the plan and procedures for project quality in accordance with the Company Quality Management System
Ensure that general project procedures are verified in accordance with the planned times and responsibilities assigned in the Project Quality Plan (PQP)
Ensure that the integrity of the Company Quality Management System is maintained when changes are made to the system for the project
Plan and allocate Quality functions to the various area of the project
Ensure, within the project organization, the planning and performance of activities aimed at promoting the quality requirements specified by the Client
Ensure that the correct implementation of the Project Quality Management System (PQMS) is checked and monitored through the planning and implementation of a quality audit programs that take account of the status and importance of project processes
Ensure, in compliance with Company procedures, the issue and filing of quality reports and audit reports, including those relating to follow-ups on agreed corrective actions
Conduct, when required by the contract and in accordance with criteria and procedures defined by project management, external inspection checks to assess the Quality Management System of Suppliers for Project qualification purposes
Ensure management of nonconformities including checking that the functions responsible keep non-conforming products under control
Promote, when opportune, appropriate actions in order to prevent or eliminate potential non-conformities and their causes
Support the Project Manager in relations with the Client and with the Authorities responsible for quality matters
Ensure the systematic collection of lessons learned from the individual project in order to continually improve processes
Ensure the preparation of Quality Control specifications for the construction works, coordinating and agreeing the checks by the Technical Departments and Client
Ensure the issue of quality requirements to be incorporated, also in the contractual documents, with Suppliers and organizations in charge of works, also coordinating issue of the construction quality management and control specifications
Perform Quality training activities within the various area of the Project
Organize and lead the Project Quality Management Review


Back to Top
Project Quality Manager - Milan, Italy – office then Saudi Arabia – site base - Job No. 2983 Listed 22/8/14

Project: Jazan Project , Saudi Aramco
Start date: URGENT
Duration: 12 months in Italy + 12 months in Saudi Arabia
Rotation: 120/16
Working days/hours: 5 days per week / 8 hours per day
Please submit salary expectation along with the CV
Living allowance EUR 1’162 per month or pro rate thereof (paid per days of presence at working place)
Accommodation: Single apartment provided by Company
Insurance D&D: USD 300‘000
Life Insurance: USD 200‘000
Medical Insurance: Worldwide Medical Protection provided by Company
Pension Fund contribution: 5% contribution from employee and 5% contribution from the employer
Travel : Prepaid Economy class ticket at beginning, end of CNT and for each work leave rotation cycle
Pre employment expenses: On Company account
Role Name: Project Quality Manager
Role Description
Mission
Plan and implement the Project Quality Management activities within the project
Coordinate the project Quality Control activities implementation
Report to Company Quality Manager information and data about Project in line with Corporate Guidelines
Tasks
Ensure the definition of the Project Quality Management System (PQMS) and preparation and distribution of the plan and procedures for project quality in accordance with the Company Quality Management System
Ensure that general project procedures are verified in accordance with the planned times and responsibilities assigned in the Project Quality Plan (PQP)
Ensure that the integrity of the Company Quality Management System is maintained when changes are made to the system for the project
Plan and allocate Quality functions to the various area of the project
Ensure, within the project organisation, the planning and performance of activities aimed at promoting the quality requirements specified by the Client
Ensure that the correct implementation of the Project Quality Management System (PQMS) is checked and monitored through the planning and implementation of a quality audit programme that take account of the status and importance of project processes
Ensure, in compliance with Company procedures, the issue and filing of quality reports and audit reports, including those relating to follow-ups on agreed corrective actions
Conduct, when required by the contract and in accordance with criteria and procedures defined by project management, external inspection checks to assess the Quality Management System of Suppliers for Project qualification purposes
Ensure management of non conformities including checking that the functions responsible keep non-conforming products under control
Promote, when opportune, appropriate actions in order to prevent or eliminate potential non-conformities and their causes
Support the Project Manager in relations with the Client and with the Authorities responsible for quality matters
Ensure the systematic collection of lessons learned from the individual project in order to continually improve processes
Ensure the preparation of Quality Control specifications for the construction works, co-ordinating and agreeing the checks by the Technical Departments and Client
Ensure the issue of quality requirements to be incorporated, also in the contractual documents, with Suppliers and organisations in charge of works, also co-ordinating issue of the construction quality management and control specifications
Perform Quality training activities within the various area of the Project
Organise and lead the Project Quality Management Review

Back to Top

Quality Control Manager - Anapa, Russia - Job No. 2975 Listed13/8/14

Single status
Min. 5 years’ experience in Oil & Gas field
Contract type - International Contract initially, later secondment (when Work Permit is granted)
Start - asap
Duration - 12 months renewable
ROTATIONS ARE NOT SUBJECT TO NEGOTIATION they will be given both as initially accommodation will be hotel and then employees will be transferred to their apartment.
Rotation (single accommodation) - 91/16 (91 days on work site followed by 16 days of paid leave)
Rotation (hotel – initially, until apartment is granted) - 75/21 (75 days on work site followed by 21 days of paid leave)
Working days/hours - 60 hours per week (10 hours per day, from Monday to Saturday)
Salary - EUR 8’000 per Month including overtime, net, free of tax in the country of work (*equivalent to EUR 400 Daily; please note that due to local regulations employees need to be on monthly
Living Allowance/board - 76’900 RUB (local currency) pro rata, paid monthly, locally
Total GBP 7,683 per month
Accommodation - Free accommodation provided in line with Company’s standard.
Medical Insurance - Advanced (see attached package)
Insurance D&D - 300’000 USD
Life Insurance - 200’000 USD
Income Protection - Basic
Travel - Prepaid Economy class ticket at beginning, end of CNT and for each work leave rotation cycle
Pre employment Expenses - On company account.
Mission
Negotiate and analyze the contract terms and identify areas of possible risks and opportunities related to the negotiation, interpretation and application of contract clauses, exploring contractual solutions and alternatives to minimize risks and optimize opportunities during contract negotiation or contract execution.
Tasks
Manage and coordinate contract management activities ensuring that all aspects of the contract during the negotiation and execution phase are correctly addressed
Ensure that Golden Rules and Silver Guidelines are implemented
Manage the resources involved in contract management activities, develop relevant professional competencies and identify project staffing needs
Supervise the application of guidelines and standards relevant to contract management
Provide all necessary reports regarding contract management matter to the corporate/company/project management
Ensure collection and sharing of lessons learned, feedbacks and returns of experience on issues/criticality’s encountered during contract management activities
Ensure, for the area of its remit, application of the industrial risk management methodology.
For the commercial phase:
Draft all contractual/negotiation documents and define the most appropriate clauses of the contract with clients, partners (including in Cooperation, Partnership and Joint Venture Agreements) and with subcontractors/vendors for the provision of goods, services and works
Identify the most appropriate contractual solutions and contribute to the definition of optimal risk profile for the Company, ensuring that the defined risk profile is adequately reflected in the relevant contract/cooperation documents
Provide legal and contractual advice for the negotiation of loans on the markets, bank sureties, active and passive guarantees, parent company guarantees and indemnity letters
Participate in bids presentation and commercial negotiation
For the execution phase:
Recover bid contractual summary, any legal analyses and other support documentation prepared during tender phase
Verify the completeness of contract documents (consistency check), supervise their distribution to project team members and regularly execute contract induction meetings
Assist the Project Manager in developing the contract management execution strategy and ensure change process on the project, including appropriate claim management actions
Ensure that all project specific contracts for goods, services or subcontracts are drafted incorporating contractual obligations and assisting the Project Manager in identifying critical packages (subcontractors and vendors) requiring special monitoring of contract risks
Participate in the periodical project budget review meetings
Review regulatory requirements
Review, update and complete all partner agreements according to contract/project development
Coordinate the contractual documentation filling
Ensure the contribution to the Legal function for the management of preliminary activities of litigation and contribute during the following activities.


Back to Top

Baseline Inspection Coordinator - Onshore Nigeria - Job No. 2970 Listed 8/8/14

START - ASAP
DURATION - 12 Months renewable (Standard)
ROTATION - 75/21
WORKING DAYS/HOURS - 10 hours per day / 6 days per week
SALARY - GBP 450 per day of work
OVERTIME - included
ACCOMMODATION - Single Accommodation provided by company together with full boarding
TRANSPORTATION - Rotational flights provided by company (economy)
INSURANCE D&D - USD 300’000
LIFE INSURANCE - USD 200’000
MEDICAL - Worldwide Medical Protection (also covering the wife and kids under 18)
Overview
Management of 2 or 3 NDT technicians subcontracted (Prepare planning and others necessary documents to perform the UT measurements)
Management of material availability (work permit, scaffolding erection, ….) and update UT guys planning consequently
Part of the pre-commissioning tasks (perform the vessel internal and external inspections)
Update of internal document (Written Scheme of Examination, Baseline dossiers, …)
Update access database weekly, generate weekly reports and baseline reports
Skills:
Knowledge in Material, welding, and above all Oil & Gas plant
Word, Excel and Access database
Mission:
Execute safe maintenance of Mechanical Static Equipment, compliant with HSE rules, legislative regulations and international std.
Execute the activities in conformance with prescribed routed time in order to meet department objectives
Follow instructions and advises from hierarchy with regards to acceptable attitudes and behaviour
Tasks
Maintenance Execution
Ensure that the services are carried out in strict compliance with company current HSE rules
Strictly comply to contractor superior instruction for the smooth execution of the services
Execute Maintenance Preventive and Correctives operations (routine and short-term)
Identify and diagnose breakdowns or anomalies on equipment, devices, package, or systems
Control and check the equipment, installations, material at the various interventions stages using measuring devices
Replace or repair the defective elements or instruments
Carry out the maintenance tasks needed to the corrective and preventive maintenance of the components, devices, package, or systems
Maintain a permanent anticipation on the potential problems that could occur in the production plant, with close relationship with other sections, in order to prevent non-productive or non-efficient operations
Maintenance control /reporting
Take part in different daily, weekly and site coordination meetings when required by Foreman
Prepare Maintenance reports break down for submission to his Foreman
Prepare comprehensive data reports on operation (routine or other)
Inform Foreman for any abnormal situation with regard to stock of raw materials, consumables and tools
Keep informed Foreman by appropriate reporting, on the progress of maintenance operations task and, if necessary, of difficulties encountered
Follow-up the maintenance activity through a Work Order system and approve the maintenance Work Order reports through the use of the most common CMMS (SAP-UNISUP-MAXIMO-DATASTREAM, etc.)
Carry out the final controls and the associated maintenance tasks planned by CMMS
Fill and sign the data sheets which represent the maintenance file
Update the information for CMMS
QHSE/Training and Development
Request and use the appropriateness of the operating and maintenance procedures and, if necessary, ask for clarification
Demonstrate commitment to safety through language, behaviour and actions
Ensure the correct behaviour in accordance with the general safety regulations of the subsidiary
Be actively involved on his self training and development by using any type of training tools available
Ask foreman / Supervisor for support and clarification regarding training material/ vendor Data Sheet etc.
Keep updated on-the-job learning log book when present at site


Back to Top